free downloadable catalogsproducts recently added to websiteclick here for LIVE supportclick here for a list of all our products
click here to go to our home page click here to go back ../click here to go to the next page click here to go to up to this directories index page

 

Can't find it? SEARCH for it here

ATTACHING NEWELS:
NOTCHING POST & TREAD INSTALLING TO KNEE WALL USING NEWEL ATTACHING KIT
page_05-a.jpg (10115 bytes) page_05-b.jpg (14223 bytes) page_05-c.jpg (15898 bytes)

Set post in 1-7/8" from edge. Mark newel placement on tread, notch tread
1-1/2" deep, transfer markings to newel.
Notch newel 50% of thickness. Apply adhesive. Pre-drill hole for 3/8" wood plug
and finish with smaller pilot hole for 3"
wood screw or lag bolts. Attach newel.

Measure, cut and install cap over rough framing. Pre-drill newels with 3/8" hole
for wood plug and finish with smaller pilot hole for 4-1/2" wood screw. Apply
adhesive and screw into place.

Use the j-anchor newel attaching kit to
install newels directly into steps or on landings. Follow directions on box. An alternate method for landings is to remove
the sub floor and attach the newel directly
into the floor joist.
MEASURING, CUTTING & INSTAlLING LANDING TREAD, PLOWED HANDRAIL AND SHOERAIL:
.
LANDING TREAD: Landing tread can be used with 3/4" oak flooring along a landing when solid oak treads and risers are used. page_06-a.jpg (8014 bytes) Landing tread can be used along a balcony with either oak flooring or carpet. Properly cut miters and attach directly to subfloor. page_06-a.jpg (8014 bytes)
. .
ATTACHING HANDRAIL & SHOERAIL ALONG STEPS:
page_06-c.jpg (23169 bytes) page_06-d.jpg (27502 bytes)
. . .
ALONG BALCONY: . .
page_06-e.jpg (14773 bytes) page_06-e.jpg (14773 bytes) page_06-e.jpg (14773 bytes)

 


 

Send this page to a Friend. Click Here

 

 

 

L10 Web Stats Reporter 3.15 LevelTen Hit Counter - Free PHP Web Analytics Script
LevelTen dallas web development firm - website design, flash, graphics & marketing